Nod for revised cost of power infra project
Odisha’s cabinet approved a revised cost of Rs 854.24 crore for a grid substation at Paradip (Ersama) to meet rising industrial power demand. This project will enhance power infrastructure for the PCPIR and strengthen the transmission network, linking the state capital with industrial hubs. Inspired By
